+8613963751807
The external painting of the 7000 cubic meter process water tank at the Hong Kong Castle Peak Power Plant, constructed by our company, has been successfully accepted!
The external painting of the 7000 cubic meter process water tank at the Hong Kong Castle Peak Power Plant, constructed by our company, has been successfully accepted!
The external painting of the 7,000 m³ process water tank at Hong Kong Castle Peak Power Plant, constructed by our company, has successfully passed inspection! Recently, both the client and the supervision team arrived on-site for the final acceptance of the tank’s external painting. The inspection covered various aspects including the dry film thickness of the paint on the tank’s outer walls, surface roughness, and touch-up painting at welded joints. After completing the inspection, the client and supervision team expressed high praise and recognition for the quality and compliance rate of our engineering work. Moving forward, the wavy pattern painting on the process water tank will be carried out. We hope the on-site project team will maintain the same high standard of engineering quality as before, creating opportunities and laying a solid foundation for future cooperation!


TANK TIPS AND RESOURCES
Request a quote for your next above ground storage tank project.

