{"id":277,"date":"2026-01-13T08:00:38","date_gmt":"2026-01-13T08:00:38","guid":{"rendered":"https:\/\/an991a9hy4.onrocket.site\/?p=277"},"modified":"2026-01-22T06:34:43","modified_gmt":"2026-01-22T06:34:43","slug":"west-africa-sierra-leone-mine-phase-ii-power-station-operating-smoothly","status":"publish","type":"post","link":"https:\/\/www.shijievt.com\/es\/2026\/01\/13\/west-africa-sierra-leone-mine-phase-ii-power-station-operating-smoothly\/","title":{"rendered":"West Africa Sierra Leone Mine Phase II Power Station Operating Smoothly!"},"content":{"rendered":"<p><strong>News Alert:<\/strong>&nbsp;The Phase II Power Station at the Sierra Leone mine in West Africa is currently operating smoothly, with our operational support services continuing uninterrupted. Key equipment, including generator sets, fuel storage tanks, water tanks, pipelines, and fire protection systems, is monitored 24\/7, providing a steady and reliable energy supply to the power generation units. This ensures robust support and security for the development of Sierra Leone&#8217;s mining industry. Thank you for your hard work, everyone!<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1980\" height=\"1288\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-1980x1288.png\" alt=\"\" class=\"wp-image-1058\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-1980x1288.png 1980w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-300x195.png 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-768x500.png 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-1536x999.png 1536w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-18x12.png 18w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-600x390.png 600w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109.png 2048w\" sizes=\"auto, (max-width: 1980px) 100vw, 1980px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>News Alert:&nbsp;The Phase II Power Station at the Sierra Leone mine in West Africa is currently operating smoothly, with our operational support services continuing uninterrupted. Key equipment, including generator sets, fuel storage tanks, water tanks, pipelines, and fire protection systems, is monitored 24\/7, providing a steady and reliable energy supply to the power generation units. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[19],"tags":[],"class_list":["post-277","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts\/277","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/comments?post=277"}],"version-history":[{"count":2,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts\/277\/revisions"}],"predecessor-version":[{"id":1062,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts\/277\/revisions\/1062"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/media\/1060"}],"wp:attachment":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/media?parent=277"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/categories?post=277"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/tags?post=277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}