{"id":277,"date":"2026-01-13T08:00:38","date_gmt":"2026-01-13T08:00:38","guid":{"rendered":"https:\/\/an991a9hy4.onrocket.site\/?p=277"},"modified":"2026-01-22T06:34:43","modified_gmt":"2026-01-22T06:34:43","slug":"west-africa-sierra-leone-mine-phase-ii-power-station-operating-smoothly","status":"publish","type":"post","link":"https:\/\/www.shijievt.com\/es\/2026\/01\/13\/west-africa-sierra-leone-mine-phase-ii-power-station-operating-smoothly\/","title":{"rendered":"\u00c1frica Occidental La central el\u00e9ctrica de la fase II de la mina de Sierra Leona funciona sin problemas"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>Alerta de noticias:<\/strong>&nbsp;La central el\u00e9ctrica de fase II de la mina de Sierra Leona, en \u00c1frica Occidental, funciona actualmente sin problemas, y nuestros servicios de apoyo operativo contin\u00faan sin interrupci\u00f3n. Los equipos clave, incluidos los grupos electr\u00f3genos, los tanques de almacenamiento de combustible, los dep\u00f3sitos de agua, las tuber\u00edas y los sistemas de protecci\u00f3n contra incendios, se supervisan 24 horas al d\u00eda, 7 d\u00edas a la semana, proporcionando un suministro de energ\u00eda constante y fiable a las unidades de generaci\u00f3n de energ\u00eda. Esto garantiza un s\u00f3lido apoyo y seguridad para el desarrollo de la industria minera de Sierra Leona. \u00a1Gracias a todos por vuestro duro trabajo!<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1980\" height=\"1288\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-1980x1288.png\" alt=\"\" class=\"wp-image-1058\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-1980x1288.png 1980w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-300x195.png 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-768x500.png 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-1536x999.png 1536w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-18x12.png 18w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109-600x390.png 600w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122142753_691_109.png 2048w\" sizes=\"(max-width: 1980px) 100vw, 1980px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>News Alert:&nbsp;The Phase II Power Station at the Sierra Leone mine in West Africa is currently operating smoothly, with our operational support services continuing uninterrupted. Key equipment, including generator sets, fuel storage tanks, water tanks, pipelines, and fire protection systems, is monitored 24\/7, providing a steady and reliable energy supply to the power generation units. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[19],"tags":[],"class_list":["post-277","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts\/277","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/comments?post=277"}],"version-history":[{"count":0,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts\/277\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/media\/1060"}],"wp:attachment":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/media?parent=277"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/categories?post=277"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/tags?post=277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}