{"id":47,"date":"2026-01-09T03:33:39","date_gmt":"2026-01-09T03:33:39","guid":{"rendered":"https:\/\/an991a9hy4.onrocket.site\/?p=47"},"modified":"2026-01-22T02:31:02","modified_gmt":"2026-01-22T02:31:02","slug":"custom-fabrication","status":"publish","type":"post","link":"https:\/\/www.shijievt.com\/es\/2026\/01\/09\/custom-fabrication\/","title":{"rendered":"FABRICACI\u00d3N A MEDIDA"},"content":{"rendered":"<h1 class=\"wp-block-heading\">Manufacturing of Large Vertical Steel Storage Tanks<\/h1>\n\n\n\n<h3 class=\"wp-block-heading\">Manufacturing Capability Overview<\/h3>\n\n\n\n<p>The manufacturing of large vertical steel storage tanks requires strict control of materials, fabrication processes, welding quality, and inspection procedures.<br>As a professional storage tank manufacturer, we provide <strong>integrated fabrication solutions<\/strong> for large-capacity vertical tanks used in oil, chemical, water, and industrial applications.<\/p>\n\n\n\n<p>Our manufacturing capability covers:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Heavy steel plate processing<\/li>\n\n\n\n<li>Precision cutting, rolling, and forming<\/li>\n\n\n\n<li>Qualified welding procedures<\/li>\n\n\n\n<li>Comprehensive quality inspection and testing<\/li>\n\n\n\n<li>Preparation for field erection and on-site construction<\/li>\n<\/ul>\n\n\n\n<blockquote class=\"wp-block-quote is-style-default is-layout-flow wp-block-quote-is-layout-flow\">\n<p><em>Manufacturing quality is the foundation of storage tank safety and service life.<\/em><\/p>\n<\/blockquote>\n\n\n\n<h3 class=\"wp-block-heading\">Raw Material Control and Steel Plate Processing<\/h3>\n\n\n\n<p>All steel plates used in our storage tanks are sourced from qualified mills and inspected upon arrival.<\/p>\n\n\n\n<p>Material control includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Steel grade verification (Q235B, Q345R, ASTM A36, ASTM A516, etc.)<\/li>\n\n\n\n<li>Plate thickness and dimensional inspection<\/li>\n\n\n\n<li>Material traceability and certification (MTC)<\/li>\n<\/ul>\n\n\n\n<p>Steel plate processing capabilities include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>CNC cutting and beveling<\/li>\n\n\n\n<li>Plate rolling for large-diameter shells<\/li>\n\n\n\n<li>Edge preparation for automatic welding<\/li>\n<\/ul>\n\n\n\n<p>Strict material control ensures consistency between design calculations and actual fabrication.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1980\" height=\"1114\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122101926_1669_718-1980x1114.jpg\" alt=\"\" class=\"wp-image-919\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122101926_1669_718-1980x1114.jpg 1980w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122101926_1669_718-300x169.jpg 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122101926_1669_718-768x432.jpg 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122101926_1669_718-1536x864.jpg 1536w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122101926_1669_718-2048x1152.jpg 2048w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122101926_1669_718-18x10.jpg 18w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122101926_1669_718-600x338.jpg 600w\" sizes=\"auto, (max-width: 1980px) 100vw, 1980px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Shell, Bottom, and Roof Fabrication<\/h3>\n\n\n\n<p><strong>Shell Fabrication<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rolling and forming of shell plates<\/li>\n\n\n\n<li>Accurate control of roundness and verticality<\/li>\n\n\n\n<li>Pre-assembly for dimensional verification<\/li>\n<\/ul>\n\n\n\n<p><strong>Bottom Fabrication<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Bottom plate layout and fit-up<\/li>\n\n\n\n<li>Annular plate installation<\/li>\n\n\n\n<li>Welding sequence control to minimize deformation<\/li>\n<\/ul>\n\n\n\n<p><strong>Roof Fabrication<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fixed roof panel fabrication<\/li>\n\n\n\n<li>Floating roof pontoon assembly<\/li>\n\n\n\n<li>Structural component fitting and alignment<\/li>\n<\/ul>\n\n\n\n<p>Each fabrication stage follows approved procedures to ensure dimensional accuracy and structural integrity.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1980\" height=\"1114\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/f1374130cd86d78c160dac0c43759f9f-1980x1114.jpg\" alt=\"\" class=\"wp-image-916\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/f1374130cd86d78c160dac0c43759f9f-1980x1114.jpg 1980w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/f1374130cd86d78c160dac0c43759f9f-300x169.jpg 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/f1374130cd86d78c160dac0c43759f9f-768x432.jpg 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/f1374130cd86d78c160dac0c43759f9f-1536x864.jpg 1536w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/f1374130cd86d78c160dac0c43759f9f-2048x1152.jpg 2048w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/f1374130cd86d78c160dac0c43759f9f-18x10.jpg 18w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/f1374130cd86d78c160dac0c43759f9f-600x338.jpg 600w\" sizes=\"auto, (max-width: 1980px) 100vw, 1980px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Welding Process and Quality Control<\/h3>\n\n\n\n<p>Welding is a critical process in storage tank manufacturing.<br>All welding activities are carried out in accordance with approved Welding Procedure Specifications (WPS).<\/p>\n\n\n\n<p>Our welding quality control includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Qualified welders and welding operators<\/li>\n\n\n\n<li>Automatic and semi-automatic welding processes<\/li>\n\n\n\n<li>Control of welding parameters and sequence<\/li>\n\n\n\n<li>Visual inspection and non-destructive testing (RT, UT, MT, PT)<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1980\" height=\"1113\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122102452_1676_718-1980x1113.png\" alt=\"\" class=\"wp-image-924\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122102452_1676_718-1980x1113.png 1980w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122102452_1676_718-300x169.png 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122102452_1676_718-768x432.png 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122102452_1676_718-1536x864.png 1536w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122102452_1676_718-2048x1152.png 2048w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122102452_1676_718-18x10.png 18w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122102452_1676_718-600x337.png 600w\" sizes=\"auto, (max-width: 1980px) 100vw, 1980px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Dimensional Control and Pre-Assembly<\/h3>\n\n\n\n<p>Before shipment or field erection, fabricated components undergo strict dimensional checks.<\/p>\n\n\n\n<p>Inspection items include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Plate dimensions and tolerances<\/li>\n\n\n\n<li>Nozzle orientation and elevation<\/li>\n\n\n\n<li>Shell roundness and alignment<\/li>\n<\/ul>\n\n\n\n<p>Pre-assembly ensures that components can be installed smoothly during on-site construction, reducing installation risks and rework.Surface Treatment and Corrosion Protection<\/p>\n\n\n\n<p>Surface treatment is performed according to project-specific requirements and operating conditions.<\/p>\n\n\n\n<p>Typical processes include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Abrasive blasting to specified standards<\/li>\n\n\n\n<li>Application of internal and external coating systems<\/li>\n\n\n\n<li>Coating thickness measurement and inspection<\/li>\n<\/ul>\n\n\n\n<p>Proper corrosion protection significantly extends the service life of storage tanks, especially in harsh environments.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1980\" height=\"1114\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260109172237_1471_257-1980x1114.jpg\" alt=\"\" class=\"wp-image-918\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260109172237_1471_257-1980x1114.jpg 1980w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260109172237_1471_257-300x169.jpg 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260109172237_1471_257-768x432.jpg 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260109172237_1471_257-1536x864.jpg 1536w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260109172237_1471_257-2048x1152.jpg 2048w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260109172237_1471_257-18x10.jpg 18w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260109172237_1471_257-600x338.jpg 600w\" sizes=\"auto, (max-width: 1980px) 100vw, 1980px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Preparation for Field Erection and Delivery<\/h3>\n\n\n\n<p>Fabricated components are properly marked, packed, and prepared for transportation to the project site.<\/p>\n\n\n\n<p>Our preparation includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Component identification and labeling<\/li>\n\n\n\n<li>Protection of machined and welded surfaces<\/li>\n\n\n\n<li>Documentation for installation and inspection<\/li>\n<\/ul>\n\n\n\n<p>This ensures efficient on-site assembly and construction.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1980\" height=\"1114\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/1b9340fd8bfed1458a202ef8bd196ec0-1-1980x1114.jpg\" alt=\"\" class=\"wp-image-923\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/1b9340fd8bfed1458a202ef8bd196ec0-1-1980x1114.jpg 1980w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/1b9340fd8bfed1458a202ef8bd196ec0-1-300x169.jpg 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/1b9340fd8bfed1458a202ef8bd196ec0-1-768x432.jpg 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/1b9340fd8bfed1458a202ef8bd196ec0-1-1536x864.jpg 1536w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/1b9340fd8bfed1458a202ef8bd196ec0-1-2048x1152.jpg 2048w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/1b9340fd8bfed1458a202ef8bd196ec0-1-18x10.jpg 18w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/1b9340fd8bfed1458a202ef8bd196ec0-1-600x338.jpg 600w\" sizes=\"auto, (max-width: 1980px) 100vw, 1980px\" \/><figcaption class=\"wp-element-caption\">default<\/figcaption><\/figure>","protected":false},"excerpt":{"rendered":"<p>Every tank we build is a custom project, designed and fabricated to perform a specific function. Our fabrication\u00a0facilities, strategically located in Chester, PA and Leesville, SC, have a combined fabrication area of over 145,000 square feet. We have extensive capabilities and efficient, state-of-the-art\u00a0equipment, including:<\/p>","protected":false},"author":1,"featured_media":925,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-47","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-what-we-do"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts\/47","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/comments?post=47"}],"version-history":[{"count":4,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts\/47\/revisions"}],"predecessor-version":[{"id":926,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/posts\/47\/revisions\/926"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/media\/925"}],"wp:attachment":[{"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/media?parent=47"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/categories?post=47"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.shijievt.com\/es\/wp-json\/wp\/v2\/tags?post=47"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}