{"id":44,"date":"2026-01-09T03:29:47","date_gmt":"2026-01-09T03:29:47","guid":{"rendered":"https:\/\/an991a9hy4.onrocket.site\/?p=44"},"modified":"2026-01-22T02:40:33","modified_gmt":"2026-01-22T02:40:33","slug":"field-construction","status":"publish","type":"post","link":"https:\/\/www.shijievt.com\/ms\/2026\/01\/09\/field-construction\/","title":{"rendered":"FIELD CONSTRUCTION\u200b"},"content":{"rendered":"<p><strong>Field Erection of Large Vertical Steel Storage Tanks<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Field Construction Overview<\/h2>\n\n\n\n<p>Large vertical storage tanks are typically constructed on site due to their size and weight.<br>Field erection requires precise coordination between engineering, equipment, welding, and inspection to ensure structural safety and construction efficiency.<\/p>\n\n\n\n<p>We provide <strong>complete on-site construction solutions<\/strong> for large vertical steel storage tanks, covering oil, chemical, water, and industrial applications.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Safe, controlled, and standard-compliant construction is the foundation of every successful storage tank project.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1762\" height=\"1175\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084925_46_280.jpg\" alt=\"\" class=\"wp-image-929\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084925_46_280.jpg 1762w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084925_46_280-300x200.jpg 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084925_46_280-768x512.jpg 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084925_46_280-1536x1024.jpg 1536w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084925_46_280-18x12.jpg 18w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084925_46_280-600x400.jpg 600w\" sizes=\"auto, (max-width: 1762px) 100vw, 1762px\" \/><\/figure>\n<\/blockquote>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">2. On-Site Construction Method and Process<\/h2>\n\n\n\n<p>Based on project conditions and tank size, we adopt proven field erection methods, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Bottom plate and annular plate installation<\/li>\n\n\n\n<li>Shell erection using hydraulic jacking or step-by-step assembly<\/li>\n\n\n\n<li>Automatic and manual welding under controlled procedures<\/li>\n\n\n\n<li>Roof installation (fixed roof or floating roof systems)<\/li>\n<\/ul>\n\n\n\n<p><em>Construction sequences are carefully planned to minimize deformation and ensure dimensional accuracy.<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1440\" height=\"1080\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084912_53_280.jpg\" alt=\"\" class=\"wp-image-930\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084912_53_280.jpg 1440w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084912_53_280-300x225.jpg 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084912_53_280-768x576.jpg 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084912_53_280-16x12.jpg 16w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20250703084912_53_280-600x450.jpg 600w\" sizes=\"auto, (max-width: 1440px) 100vw, 1440px\" \/><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">3. Quality Control, Inspection, and Safety<\/h2>\n\n\n\n<p>All field construction activities are carried out under strict quality and safety management.<\/p>\n\n\n\n<p>Our on-site control includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Compliance with approved construction procedures<\/li>\n\n\n\n<li>Continuous welding inspection and non-destructive testing<\/li>\n\n\n\n<li>Dimensional checks during each construction stage<\/li>\n\n\n\n<li>Safety management and risk control on site<\/li>\n<\/ul>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p><em>Every critical stage is inspected to meet applicable design codes and standards.<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"1280\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122103736_433_22.jpg\" alt=\"\" class=\"wp-image-931\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122103736_433_22.jpg 1280w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122103736_433_22-300x300.jpg 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122103736_433_22-150x150.jpg 150w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122103736_433_22-768x768.jpg 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122103736_433_22-12x12.jpg 12w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122103736_433_22-600x600.jpg 600w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260122103736_433_22-100x100.jpg 100w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n<\/blockquote>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">4. Commissioning and Project Handover<\/h2>\n\n\n\n<p>After construction completion, tanks undergo final inspection and testing according to project requirements.<\/p>\n\n\n\n<p>This includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Visual and dimensional inspection<\/li>\n\n\n\n<li>Leakage testing and functional checks<\/li>\n\n\n\n<li>Documentation and quality records submission<\/li>\n<\/ul>\n\n\n\n<p>The project is formally handed over only after meeting all technical and safety requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1440\" height=\"1080\" src=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260106172017_4468_1381.jpg\" alt=\"\" class=\"wp-image-932\" srcset=\"https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260106172017_4468_1381.jpg 1440w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260106172017_4468_1381-300x225.jpg 300w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260106172017_4468_1381-768x576.jpg 768w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260106172017_4468_1381-16x12.jpg 16w, https:\/\/www.shijievt.com\/wp-content\/uploads\/2026\/01\/\u5fae\u4fe1\u56fe\u7247_20260106172017_4468_1381-600x450.jpg 600w\" sizes=\"auto, (max-width: 1440px) 100vw, 1440px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Shijie Heavy Industry field construction methods are state-of-the-art in both process and safety. Our teams are made up of long-term, permanent employees who know tanks inside and out, and are committed to safe, successful projects. Shijie Heavy Industry have the insights and agility to work with customers and site owners in a way that eliminates disruptions to workflows and helps ensure optimum productivity. Our\u00a0Construction Management team has a collective 50+ years\u2019 combined experience and our\u00a0Field Foremen average 15 years with shijie, giving you some the best tank know-how in the business.<\/p>","protected":false},"author":1,"featured_media":45,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-44","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-what-we-do"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/posts\/44","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/comments?post=44"}],"version-history":[{"count":4,"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/posts\/44\/revisions"}],"predecessor-version":[{"id":933,"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/posts\/44\/revisions\/933"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/media\/45"}],"wp:attachment":[{"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/media?parent=44"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/categories?post=44"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.shijievt.com\/ms\/wp-json\/wp\/v2\/tags?post=44"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}